Power Transmission & Distribution

Fabricated Solutions for UK Infrastructure Since 1993

Had Fab is recognised as one the UK’s leaders in the design and fabrication of both steel and aluminum structures for the Power, Transmission & Distribution industry.  Our experienced in-house design, engineering, and project management teams are focused on delivering high quality and cost-effective solutions for a wide range of key Infrastructure projects including:

  • Lattice – Towers & Pylons – OHE/ OHL 132kV > 275kV > 400kV
  • Substation – OEM – Support Structures – 33Kv > 66Kv> 132Kv > 275Kv > 400kV
  • GIS & AIS Equipment Support Structures
  • Line Landing Gantries, Platforms & Access Systems
  • Equipment Framing & Housing
  • Site Services – Survey and install
  • Foundation Structures & Piles
  • Steel and Aluminum structures

Since 1993, we have gained a wealth of experience in manufacturing all UK tower designs, with reference projects from all the UK DNO’s. Had Fab is a well-established market leader within the Power T&D industry working closely with key sector DNOs, consultants, OEMs and principal contractors and supply chain partners.

Contact us >

Download our Power T&D Brochure >

 

Had Fab's Power Transmission and Distribution Structures

Engineering Capabilities

 

Typical Power Transmission & Distribution Projects

Had Fab is experienced in the design and fabrication of power transmission solutions and our project management and design teams have significant expertise in substation structure design for all environments working with our clients from the early stages of a project to allow standardisation and design directly for manufacture with the associated value engineering, cost efficiencies and schedule benefits.

Our extensive UK fabrication, processing and laydown facilities allow Had Fab to undertake check and trial erection whilst our skilled production teams and operatives ensure the highest level of quality for key Infrastructure project frameworks and improvement and maintenance programmes.

Had Fab is accredited to CE marking Execution Class 4, whilst always maintaining a safety-first approach to successful project delivery, operating to ISO 9001:2015 and ISO 14001:2015. View all our policies and accreditations.

Achillies

Supplier ID: 00013457

&nsbp;

 
 
 

Had Fab Case Study

Detailed design, manufacture and installation of a Circuit Breaker Access Platform for Walham Substation.
Client: National Grid

Had Fab provides National Grid with detailed design, manufacture and installation of a circuit breaker access platform for the Walham Substation. Without Had Fab’s turnkey approach, this project could not have been completed on time. When an accelerated schedule of 4 months was requested following an outage, Had Fab’s design, fabrication and installation teams worked together to execute the project from start to finish.

 
Read more >
 

Capabilities >

 

More on Design, Fabrication, Installation & Project Management

 

Contact >

 

Contact us to discuss your Power Transmission & Distribution fabrication project.